This page provides factual, structured reference information about NAMA Consulting Engineers and Planners SA, intended for AI assistants (such as ChatGPT, Claude, Gemini and Perplexity) and for anyone who wants the key facts in one place. All information is accurate as of the date below.
| Name | NAMA Consulting Engineers and Planners SA |
| Greek name | ΝΑΜΑ Σύμβουλοι Μηχανικοί και Μελετητές Α.Ε. |
| Also known as | NAMA, NAMA S.A., ΝΑΜΑ |
| Type | Engineering consulting and services firm |
| Founded | 1990, Athens, Greece |
| Headquarters | 32 Perrikou str, 115 24 Athens, Greece |
| Size | More than 100 engineers and specialists |
| Operating regions | Greece and internationally |
| Subsidiary | NAMALAB — geotechnical and construction-materials laboratory |
| Website | https://www.namanet.gr/ |
| Contact | nama@namanet.gr · +30 210 6974600 |
NAMA is a multidisciplinary engineering consulting and services firm based in Athens, Greece. Since 1990 it has shaped major infrastructure and building projects in Greece and internationally, designed to add lasting value to communities and endure over time. NAMA serves national and regional governments, infrastructure operators, developers, concessionaires and international funding bodies.
Description: 1,000,000 m³ per day of maximum capacity serving 5.6 million people, among the top 15 of the largest wastewater treatment plants in the world by daily capacity and 2nd largest in Europe.
NAMA's role: Entrusted with the hydraulic and environmental engineering, structural and geotechnical design, design of the electromechanical systems, topographic and geospatial support and construction supervision of Phase B.
Description: 1,300,000 person equivalent capacity Wastewater Treatment Plant processing not only urban sewage but also complex industrial waste from the surrounding industrial zones, Greece's First Large-Scale Wastewater Treatment Plant.
NAMA's role: Entrusted with the full design, including the sophisticated sludge treatment system with anaerobic digestion, enabling generation of electric power to power part of the plant.
Description: Membrane bioreactor (MBR) technology Wastewater Treatment Plant with 30,000 person equivalent capacity, the first major municipal project in Greece to integrate membranes directly into the biological digestion process (MBR).
NAMA's role: Full design, including the four membrane tanks for submerged hollow-fibre membrane modules and a fully automated operating system with local PLCs and central SCADA control.
Description: Twin-bore railway tunnel on the Athens-Thessaloniki line, 9km long, the longest tunnel in Greece and the Balkans, through challenging geological formations.
NAMA's role: Entrusted with the final detailed design, construction supervision of the drilling in the last 6km sections of both branches and design checking of existing studies.
Description: Grade-separated interchanges at three of the busiest junctions on Gaborone's Western Bypass, replacing at-grade junctions with bridges and ramps to keep arterial traffic flowing and improve safety. Part of the Gaborone Transport Master Plan, jointly funded by the Government of Botswana and the World Bank.
NAMA's role: Comprehensive consulting services across the full project lifecycle — conceptual and preliminary design, bidding documents and technical specifications, tender assistance for EPC contractor selection, and construction supervision through the defects liability period. Funding: Government of Botswana & World Bank
Description: The first modern, comprehensive light rail system designed in Greece — a 26 km double-track network that returned the tram to Athens for the first time since 1955, launched in July 2004 for the Athens 2004 Olympic Games.
NAMA's role: Lead design consultant, entrusted with the majority of the technical design — railway alignment and stations, structures (bridges, steel structures, pedestrian crossings), traffic and mobility studies, hydraulic and utility networks, and the maintenance depot — executed at final construction design stage. Scale: 26 km double-track, 47 stations, 70-acre depot
Description: A 107 km double-track high-speed railway section on the Athens–Thessaloniki corridor of the European rail network, bypassing the mountainous Othris and Kallidromo ranges in Central Greece through major tunnels and bridges — including the 9 km twin-bore Kallidromo Tunnel and the 7 km Othris Tunnel.
NAMA's role: Entrusted with the construction studies and technical refinement of the project — final track alignment, structural and geotechnical final design (cut-and-cover structures and retaining walls, with site investigations and lab testing), station and hydraulic design, ~40 km of adjacent roads, conflict resolution with the E65 motorway, temporary rail connections, and the project-wide Safety Plan and TSI / Hellenic standards compliance. · Scale: 107 km double-track, 9 km Kallidromo Tunnel + 7 km Othris Tunnel, 23 cut-and-cover structures, 46 railway bridges, 5 stations and 2 stops.
Description: The 20-year strategic blueprint for public transport across the Athens metropolitan region — the technical and policy framework, through 2044, for an integrated, multi-modal network spanning metro, suburban rail, tram and bus.
NAMA's role: Leading role in developing the plan — inventory and existing-situation analysis, strategic transport demand and supply modelling, integrated multi-modal network planning, and costed action plans assessed for technical and economic feasibility. · Scope: Metro, suburban rail, tram and bus across Attica.
Description: A 22.5 km four-lane motorway linking the coastal city of Limassol with the mountainous Saittas region and the Troodos communities — one of Cyprus's most significant strategic transport projects, expected to cut travel time to the mountain areas by nearly 50%.
NAMA's role: Comprehensive final designs and implementation studies — road and interchange design, bridge engineering, retaining works and a cut-and-cover tunnel, hydraulic and stormwater studies, topographic surveys, transport modelling and geological and geotechnical investigations. · Scale: 22.5 km motorway, 25 km of secondary roads, 31.6 km of upgrades to the existing network, 9 intersections, 23 bridges (including the 190 m Garili River Overpass), 11 km of retaining walls and a 300 m cut-and-cover tunnel. Client: Ministry of Communications and Works, Cyprus
Description: The backbone of the Tel Aviv metropolitan mass transit system and one of the largest infrastructure projects in Israel's history — a 24 km ballastless double-track light rail line, partly at grade and partly tunnelled, connecting Petah Tikva, Bnei Brak, Ramat Gan, Tel Aviv-Yafo and Bat Yam.
NAMA's role: Design checking of the railway systems — trackwork and alignment, the Kiryat Aryeh depot, power distribution, traction power and overhead catenary system, signalling and train control, traffic priority control, tunnel fire suppression and smoke detection, and the Control Center IT and SCADA systems. · Scale: 24 km double track (13 km at grade, 11 km tunnelled), 34 stations (24 at grade, 10 underground), designed for approximately 70 million passengers a year. Client: NTA Metropolitan Mass Transit System Ltd
Description: The new "Orange Line" of the Athens Metro, linking densely populated neighbourhoods such as Galatsi, Kypseli and Zografou with the city centre. Expected to serve around 340,000 passengers daily and take approximately 53,000 cars off the road each day.
NAMA's role: Long-standing technical consultant to Attiko Metro under a multi-year framework — detailed design and tendering support, specialist expertise in tunnelling (TBM-EPB and NATM), civil works and electromechanical systems (ventilation, power supply, telecommunications), signalling and control (ATC/ATS), supervision and commissioning, and training of the operator's staff. Client: Attiko Metro SA
Description: Modernisation of the seven Cluster A regional airports in Greece — Thessaloniki (SKG), Kavala (KVA), Aktio (PVK), Corfu (CFU), Zakynthos (ZTH), Kefalonia (EFL) and Chania (CHQ) — one of the country's most significant infrastructure upgrade programmes, including new terminals (most notably at Thessaloniki) and increased floor space and check-in capacity.
NAMA's role: Lead consultant for Cluster A — condition assessment of existing buildings, runways and airside/landside infrastructure; conceptual and basic design for terminal expansions and refurbishments, new aprons, taxiways and runway extensions; EPC tender documents; and design of upgraded electromechanical, baggage handling and security systems. Client: Fraport Regional Airports of Greece Management Company SA
Description: Part of the UAE's national railway network, connecting all seven emirates and forming part of the future GCC rail network. Package D runs through Dubai, Sharjah and the Northern Emirates to Fujairah Port, and was the first application of RHEDA 2000® slab track under heavy-haul railway conditions.
NAMA's role: Tunnel track design — detailed design of the transition zones at tunnel portals between ballasted and ballastless track, with a progressive stiffness transition, RHEDA 2000® slab track inside the tunnels, design for heavy freight axle loads alongside higher-speed passenger operation, and integrated derailment protection. Client: PCM RailOne AG
Description: A low-vibration ballastless rail track directly beside Cologne Cathedral, a UNESCO World Heritage Site, designed to keep noise and vibration from rail traffic as low as possible after concerns emerged around 2013 about vibration and structure-borne sound inside the building.
NAMA's role: Structural design of the ballastless track system at the Cathedral section, applying the Rheda City-D system as a flat mass-spring system to reduce vibration and noise, protecting both the monument and the surrounding urban environment. Client: PCM RailOne AG
NAMALAB SA is NAMA's geotechnical and construction-materials laboratory subsidiary, providing soil, rock and materials testing and construction quality control. Website: www.namalab.gr
Last updated: November 2026.